City of Crestview, Florida
This project consisted of demolishing most of the existing improvements and constructing a new +/-68,500 s.f. courthouse building with paved parking. The scope of work included performing the boundary, topographic and utility surveys and preparing the Site Civil Construction Plans with associated Stormwater Design and Calculations. The Site Civil Construction Plans included Site Layout, Grading and Drainage Plans, Utility Plans, Cross Sections, Details and Specifications. SEAS also provided the Traffic Generation and Distribution Report necessary to obtain the Development Order. Northwest Florida Water Management District permitting was required for the proposed stormwater system improvements. FDOT permitting was required to close the existing driveways on U.S. Hwy 90. SEAS was responsible for construction layout and the As-Built Survey and drawings. Construction and As-Built Plans were developed using AutoCAD Civil 3D software.