RD Bailey Dam
In May 2017, SEAS used a combination of GPS, Robotic Total Station and Digital Level Instrumentation to complete a control survey of the RD Bailey Dam. The dam was a challenging environment, and SEAS had to design the monitoring scheme to make this difficult survey a success.